HomeProjects

Projects

Introduction

We’ve been providing architects and engineers with the right material to bring their vision to life for over 25 years now. That’s more than two decades and a half of concrete proof of Ductal®’s strength, durability, adaptability and innovation.

We think these realisations speak volumes of our ability to bring form and function together in perfect harmony. Let’s work together to make your next project stretch the definition of what’s possible – even further.

Grafstal road bridge

Introduction

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Infrastructure

Caderousse Dam

Introduction

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

Infrastructure

Mosquito Creek BC

Introduction

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Infrastructure

Oran Shopping Mall Center

Introduction

Economic heart of the West, Oran is the second most populous city in Algeria and has few large shopping centers.

Cladding
Loading
Give shape to tomorrow.
Loading
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100