Whether looking to build a new bridge or rehabilitate an existing one, Ductal® UHPC can be used in a range of different applications. From joint fill to connect precast elements to bridge deck overlays to ensure durability, or for pier jacketing  to guarantee longevity and seismic resistance, Ductal® is ready to take on your next major challenge.

 
 

Joint Fill

Ductal® joint fill connections provide durable, long-lasting solutions for bridge construction & rehabilitation projects that complement Accelerated Bridge Construction (ABC).

 
 

Overlays

Ductal®’s innovative bridge overlay system not only protects bridge decks, but improves its structural performance with a cost-effective long-term solution.

 
 

Pier Jacketing

Ductal® strengthens and protects bridges from a variety of environmental factors when used as a cover around an existing pier or column through pier jacketing.

 
Ductal Engineering Solutions, bridge widening, La Tine Switzerland
 

Innovative solutions

Ductal® offers your bridge project a range of precast or cast-in-place solutions to suit any of your bridge construction or rehabilitation needs.

 
Why Use Ductal®?

For engineering projects of all shapes and sizes, where optimized long-term performance is a must, you can count on Ductal®'s unique mechanical properties and exceptional durability to meet all your UHPC needs.

 
Our Services

Ductal®'s team of experts has extensive technical expertise to meet client needs in project development, construction and technical assistance and quality control.

 
Our Solutions

Ductal® solutions are customizable to ensure you have the right performance, blend and treatments to best realize your project.