Contact your local expert
RATP Bus Center
Información

location_on Location: Thiais, France

date_range Date: 2008

architecture Architect: Agence ECDM (Emmanuel Combarel & Dominique Marrec)

The semi-flowable nature of Ductal® Envelope facilitated the pouring of 3D panels with a fine yet nubby Lego®-style texture. Only 3 cm thick, their lightness are made for fast installation and adjusting. 

Architects Emmanuel Combarel and Dominique Marrec of the firm ECDM were hired to do the Thiais bus centre job for the RATP. The building has several functions: primarily as a command post moving traffic for nearly 300 buses, but it also has lounges designed for bus driver relaxation.

Description

pl011435.jpg

The architects’ main idea was to integrate the new building in its environment by ensuring urban continuity in the commercial-industrial zone. Therefore, the building appears to materialize from the ground via panels of grey anthracite colored Ductal® Envelope. That skin conforms to the angles of the building, ground and roof and is broken up with wide windows in bright colours. The façade was the subject of a technical experimental assessment validated by the Centre Scientifique et Technique du Bâtiment (CSTB - Scientific and technical building centre).

Context

fa_ade_sud_angle_sud-est_philippe_ruault.jpg

Mould fabrication is a key step in Ductal® panel fabrication. Wood covered with a silicon skin was chosen for the mould structure. Ductal® is a semi-flowable concrete that facilitates the reproduction of the finest details of the mould such as the nubs (1 cm high, 20 mm diameter) of the bus centre’s panels. That required significant thoroughness in designing and cleaning moulds and in storing panels.

Optimization

007_retouch_e.jpg

The panels are fixed to the concrete structure using 304L stainless steel brackets. These brackets have oblong holes to accommodate the geometric tolerances of the structural work and to ensure the alignment of the panels. The panels are attached to the brackets using sockets crimped into them after fabrication. Pull-out tests achieved extraction forces of 427 daN without failure of the substrate. The socket installation technique does not induce expansion stress in the substrate material. A 12 mm expansion joint between the panels accommodates dimensional variations in the components.

Installation

thiais_pices_drcoffrres.jpg

Galería

thiais_pices_drcoffrres.jpg
pl011436.jpg
007_retouch_e.jpg
pl011435-1.jpg

Descubre nuestros proyectos

The new EDF Campus was inaugurated in 2017 in the Plateau de Saclay business cluster, near the well-known campuses of École Polytechnique and HEC. Built by the architecture firm Emmanuel Combarel Dominique Marrec Architects (ecdm), the building is distinguished by the remarkable volumes of its audacious façades. This technical feat was made possible by the innovative use of Ductal® Envelope...

Pritzker Prize-winner Fumihiko Maki has completed an educational centre, with a series of roof spaces, terraces and courtyards for the Aga Khan Foundation in London. A project achieved with the use of Ductal®. Each year, the foundation organizes the Aga Khan Award for Architecture, one of the world's most prestigious architecture prizes.