Contact your local expert
zha_zhuhai-civic-arts-centre-3_lowres-edit.png

解决方案

从关键的土木工程应用到大胆的建筑表现,我们的超高性能混凝土几乎无所不能。了解如何将Ductal®的无限特性用于您的下一个项目中,告诉我们您的愿景需求。

技术

 

Ductal®的多功能性使其成为最苛刻项目不可或缺的材料。其配方几乎可以无限地调整和加强,以满足几乎任何安全要求,从防爆到防火,再到创新应用方法,我们的超高性能混凝土解决方案可以成为世界上任何敏感建筑的合适解决方案。

add_box 学到更多 

spray_bandeau1.jpg.webp
banner_blash.jpg.webp
manchester_3.jpg.webp
This is an empty block.
This message only appears in the layout builder.

专案

25年来,我们坚持不懈地为建筑师和工程师提供合适的材料,将其愿景变为现实。这是25年来对Ductal®的强度、耐久性、适应性和创新性的证明。 我们认为这些成就充分说明了我们将形式和功能非常和谐地结合在一起的能力。让我们一起努力,通过下一个项目进一步扩展“可能性”的定义。

add_box 阅读更多

The Chillon Viaducts have been reinforced by an Overlay of Ductal® UHPC. Thanks to its mechanical characteristics and its durability properties, Ductal® was the only material able to provide an efficient retrofitting preserving the bearing capacity of the bridge, a lower maintenance cost and a quick retro commissioning of an important axis of the Swiss highway network. The two Chillon...

Apex House is part of Grainger’s Seven Sisters Regeneration project located on the corner of Seven Sisters Road and Tottenham High Road in London.163 new residential units across two towers and four townhouses with a mixture of tenures, as well as communal roof terraces, amenity space and a new commercial market space to accommodate the local shops.

A structure that symbolizes US bridge engineering of the 1930s, the Pulaski Skyway, which links Newark to Jersey City has been partially closed as it undergoes a considerable rehabilitation - the largest in its history. The project was a perfect opportunity for the Federal Highway Administration (FHWA) and the New Jersey Department of Transportation (NJDOT) to take full advantage of...

The rehabilitation of Mauves-sur-Loire bridge consists in substituting the existing deck (3,500 m²) made of brick vaults with a thin deck made of thin precast UHPFRC slabs. The main objective of the project is to upgrade this historic landmark by increasing its bearing capacity and allowing the addition of cantilevered footbridges.

The Honghe Suspension Bridge between Honghe Hani and Yi Autonomous Prefecture in Yunnan Province, South of China was completed within 35 days.

关于

25年来,我们坚持不懈地提供最先进的超高性能混凝土技术和服务。为了最大限度地提高性能,同时减少投入,我们成功研发了Ductal®,它代表着最佳的强度、延展性和耐久性。我们通过数十年的全球实践、研究和开发,获得必要的技术和专业知识,顺利无阻地完成世界各地最雄心勃勃的项目。我们的团队成员包括持有执照的工程师、建筑师、建筑顾问和现场技术人员,他们都直接与客户对接,针对当今建筑行业的一些最重要的问题量身定制实用的解决方案。我们发明消耗量更小、使用寿命更长的建筑材料,创造更负责任的建筑环境,提升社区,同时增加对社区自然环境的尊重。为了人类和我们赖以生存的地球,我们正在为未来的挑战提出相应的混凝土解决方案。

_dsc6668_1-1.jpg
fma-agaedmund_sumner-0071-1.jpg