信息
快来了
通过这种触变技术,加快施工流程,减少结构所需的材料用量,最大限度的保证使用寿命,并减少维护成本。
发现我们的项目
Displayed title
Yunnan Bridge
The Honghe Suspension Bridge between Honghe Hani and Yi Autonomous Prefecture in Yunnan Province, South of China was completed within 35 days.
Displayed title
IA 163 Floyd River Bridge
In partnership with Iowa State University and Iowa State DOT, with participation from Wapello and Buchana counties in Iowa, this project was the first to implement overlay application of UHPC using automated paver system brought by Walo from Europe.
Displayed title
Parking Saas Fee
Deformation of the concrete rolling surface, structural deficit in terms of puncture resistance, sloping terrain (5% gradient) ... the equation to be solved for the repair of the covered car park at the Saas-Fee ski resort was arduous. Ductal® took up the challenge and developed an innovative product meeting all these constraints.
Displayed title
Zurich Airport railway station
The four tracks of Zurich Airport's underground railway station have been renovated and lowered without interrupting traffic.