专案
25年来,我们坚持不懈地为建筑师和工程师提供合适的材料,将其愿景变为现实。这是25年来对Ductal®的强度、耐久性、适应性和创新性的证明。
我们认为这些成就充分说明了我们将形式和功能非常和谐地结合在一起的能力。让我们一起努力,通过下一个项目进一步扩展“可能性”的定义。
Chaperon Vert
With a thickness of only 16 mm, the elegant, durable and cost-efficient Ductal® UHPC rainscreen cladding solution has proven to be the most economical option for the 315 apartments' renovation of the Chaperon Vert area in Gentilly.
Gardiner Expressway
The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.
Student residence
Inaugurated in September 2014, the new Porte de Vanves student residence boasts 67 accommodation units in a bow-shaped building that meets the architectural constraints of a small, triangular building plot.
Nipigon Cable
The new Nipigon River Bridge east of Thunder Bay, Ontario is the first cable-stayed structure on the Ontario TransCanada Highway system. The project started in 2013 on this four-lane, two-span bridge which will replace an aging, two-lane structure. The new bridge has three precast concrete towers with cables supporting a 252m bridge deck and separate sidewalk for pedestrians. The center pier reaches a height of 51m above the bridge deck.