Eastbourne Arndale Centre
信息

location_on Location: Eastbourne, England

date_range Date: 2018

architecture Contractor: Freyssinet UK

Eastbourne Arndale Shopping Centre is a £85 million redevelopment including 22 retail units, seven restaurant units, a multiscreen cinema and a significant extension to the multi-storey car park. 

Traditional methods of reinforcement were considered in the initial stages of the project, which would have included traditional jacketing, propping, partial demolition and installation of new in-situ concrete. This would have meant partial, if not complete closure of the MSCP at times, and would have resulted in a 47 week programme.

Challenge

eastbourne_2.jpg

Freyssinet was instructed to carry out the full design, supply and installation of column strengthening to 84 columns in the MSCP. By utilising its innovative ExoLeafTM system - with Ductal® UHPC in precast form, Freyssinet was able to reduce the 47 week programme down to just 15 weeks, which included work on a number of special columns. As a result, the car park stayed open to the public for the majority of the works, which was crucial in the lead up to the Christmas period. Had traditional methods been adopted, this may not have been possible.

Optimization

eastbourne_1.jpg

The ExoLeafTM system can be developed as precast, cast in-situ or even sprayed, and as such it can be adapted to a wide range of applications and site conditions. The use of Ductal® Infrastructure solution was particularly effective on this project where disruptions to the structure needed to be minimised.

The expertise of Freyssinet in design and installation, combined with the performances of Ductal® and knowledge of Thorp Precast led to an excellent result serving all of the Client’s needs: safety, speed, aesthetics and quality.

Application

eastbourne_4.jpg

相册

eastbourne_4-1.jpg
eastbourne_1-1.jpg
eastbourne_2-1.jpg
eastbourne_3-1.jpg

Discover our projects

The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.

The four tracks of Zurich Airport's underground railway station have been renovated and lowered without interrupting traffic.

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Eastbourne Arndale Shopping Centre is a £85 million redevelopment including 22 retail units, seven restaurant units, a multiscreen cinema and a significant extension to the multi-storey car park.

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Dominie Creek bridge lies on ancestral territory where Caltrans and Tolowa Dee-ni’ Nation worked together to replace the old dilapidated box culvert structure. The finished bridge has an emblem of spawning salmon at each abutment barrier wall which was inspired by the locations salmon and trout spawning.

The Arlington Memorial Bridge is located in Washington DC which carries traffic over the Potomac River. The original structure used masonic decorative features which gives this bridge an iconic look.

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

A structure that symbolizes US bridge engineering of the 1930s, the Pulaski Skyway, which links Newark to Jersey City has been partially closed as it undergoes a considerable rehabilitation - the largest in its history. The project was a perfect opportunity for the Federal Highway Administration (FHWA) and the New Jersey Department of Transportation (NJDOT) to take full advantage of...

The rehabilitation of Mauves-sur-Loire bridge consists in substituting the existing deck (3,500 m²) made of brick vaults with a thin deck made of thin precast UHPFRC slabs. The main objective of the project is to upgrade this historic landmark by increasing its bearing capacity and allowing the addition of cantilevered footbridges.