Contact your local expert
Caderousse Dam
信息

location_on Location: Caderousse, France

date_range Date: 2012

architecture Contractor: Freyssinet

emoji_objects Solutions & technologies: Infrastructure

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France. 

Formed of eight openings 22 metres wide (176 metres total length), the dam spillway draws off up to 12,500 cubic meters of water per second. Although the apron was repaired in 1997, erosion in the sacrificial wear layer of 2 to 30 cm has been observed, and the reinforcing steel was visible. The secondary concrete and part of the stone concrete were eroded, allowing uplifted water to leak. During an inspection in 2009, specifications were defined to repair part n°4 of the eroded apron with Ductal® with metallic fibres. The first reinforcement being a success, the Rhône National Company completed the repair of part n°3 using the same solution.

Description

barrage_de_caderousse-10_sept-09-98-bd.jpg

The mixing of ready-mix concrete, transport by truck and the pumping of Ductal® were keys for success on the worksite. With impact and abrasion resistance comparable to granite, (reference rock), Ductal® is the ideal concrete for renovating structures subjected to high impact and abrasion.

Application

barrage_de_caderousse-10_sept-09-15-bd_0.jpg

According to the CNR, the erosion was due in part to abrasion by sand but especially to the repeated impact of large granular material against the apron. Therefore, the implementation of concrete particularly resistant to the impact was required. The impact resistance of Ductal® with metallic fibres is close to that of granite. The CNR’s impact testing demonstrated that the wear volume of Ductal® with metallic fibres was less than 30 cm3. That volume is between 250 and 400 cm3 for ordinary concrete (type B25). The CNR tested abrasion resistance relative to glass. The abrasion index of Ductal® with metallic fibres at the bottom of the opening was less than 1, while traditional concrete is more than 2 relative to glass.

Challenge

ductal_caderousse_dam_2.jpg

The company was hired for the work based on three key points for the pour:

  • The requisition of a LafargeHolcim ready-mix plant to mix the Ductal® guaranteed homogeneous production and large volume (11 m3 in four hours).
  • Transporting Ductal® by ready-mix truck facilitated a quick pour.
  • Pumping the Ductal® allowed traffic to keep moving on the bridge and prevented a costly placement from the river.

The openings were dried and cleaned to proceed with the repair of the apron in the eroded areas. The low accessibility to the openings n°3 and 4 required the Ductal® to be pumped on more than 130m. Because Ductal® is a self-compacting concrete, it can be poured directly from the pump. A thin layer of curing compound was then applied to limit surface dehydration. The spillway was put back into service in 20 days.

Optimization

ductal_caderousse_dam_3.jpg

相册

barrage_de_caderousse-10_sept-09-45-bd.jpg
ductal_caderousse_dam_1-1.jpg
caderousse-20120920-00270.jpg
barrage_de_caderousse-10_sept-09-98-bd-1.jpg

Discover our projects

The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.

The four tracks of Zurich Airport's underground railway station have been renovated and lowered without interrupting traffic.

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Eastbourne Arndale Shopping Centre is a £85 million redevelopment including 22 retail units, seven restaurant units, a multiscreen cinema and a significant extension to the multi-storey car park.

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Dominie Creek bridge lies on ancestral territory where Caltrans and Tolowa Dee-ni’ Nation worked together to replace the old dilapidated box culvert structure. The finished bridge has an emblem of spawning salmon at each abutment barrier wall which was inspired by the locations salmon and trout spawning.

The Arlington Memorial Bridge is located in Washington DC which carries traffic over the Potomac River. The original structure used masonic decorative features which gives this bridge an iconic look.

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

A structure that symbolizes US bridge engineering of the 1930s, the Pulaski Skyway, which links Newark to Jersey City has been partially closed as it undergoes a considerable rehabilitation - the largest in its history. The project was a perfect opportunity for the Federal Highway Administration (FHWA) and the New Jersey Department of Transportation (NJDOT) to take full advantage of...

The rehabilitation of Mauves-sur-Loire bridge consists in substituting the existing deck (3,500 m²) made of brick vaults with a thin deck made of thin precast UHPFRC slabs. The main objective of the project is to upgrade this historic landmark by increasing its bearing capacity and allowing the addition of cantilevered footbridges.