Eastbourne Arndale Centre

informations
Introduction

Eastbourne Arndale Shopping Centre is a £85 million redevelopment including 22 retail units, seven restaurant units, a multiscreen cinema and a significant extension to the multi-storey car park.

Displayed title

Challenge

Description

Traditional methods of reinforcement were considered in the initial stages of the project, which would have included traditional jacketing, propping, partial demolition and installation of new in-situ concrete. This would have meant partial, if not complete closure of the MSCP at times, and would have resulted in a 47 week programme.

Displayed title

Optimization

Description

Freyssinet was instructed to carry out the full design, supply and installation of column strengthening to 84 columns in the MSCP. By utilising its innovative ExoLeafTM system - with Ductal® UHPC in precast form, Freyssinet was able to reduce the 47 week programme down to just 15 weeks, which included work on a number of special columns. As a result, the car park stayed open to the public for the majority of the works, which was crucial in the lead up to the Christmas period. Had traditional methods been adopted, this may not have been possible.

Displayed title

Application

Description

The ExoLeafTM system can be developed as precast, cast in-situ or even sprayed, and as such it can be adapted to a wide range of applications and site conditions. The use of Ductal® Infrastructure solution was particularly effective on this project where disruptions to the structure needed to be minimised.

The expertise of Freyssinet in design and installation, combined with the performances of Ductal® and knowledge of Thorp Precast led to an excellent result serving all of the Client’s needs: safety, speed, aesthetics and quality.

Discover our projects

Displayed title

Grafstal road bridge

Description

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Infrastructure

Displayed title

Gardiner Expressway

Description

The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.

Infrastructure

Displayed title

SR 141 Over I95

Description

State Route 141 over I95 interchange rehabilitation was commenced in 2019 and expected to be fully completed by Spring 2022. Several crossing structures within this interchange utilized precast panels and required UHPC for all the connections.

Infrastructure

Displayed title

Arlington Memorial Bridge DC

Description

The Arlington Memorial Bridge is located in Washington DC which carries traffic over the Potomac River. The original structure used masonic decorative features which gives this bridge an iconic look.

Infrastructure
Give shape to tomorrow.
Loading
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100