Gardiner Expressway

informations
Introduction

The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.

Displayed title
Challenge

Description

The challenge was to complete all precast elements near the bridge site, where the Contractor set up a temporary precast facility for all sections of the bridge, where Ductal® Infrastructure was used to connect all precast connections to act as a composite. Schedule was a driving force as each element set in place, needed to gain the required strength of 80MPa before removing subsequent sections. UHPC connections were able to achieve these strengths in 24hrs or less through the entire season (Winter to Summer).

Displayed title

Description

Description

Our Ductal® teams have reached a major milestone with our Gardiner Expressway Rehabilitation Project (between Jarvis Street and Cherry Street) in Toronto, Canada! Not only did they respect their timeline despite Covid-19 disruptions, after 109 days and 435 m3 of UHPC since November 25 last year the project is coming to a close, representing one of the most strategic ABC projects in North America.

Discover our projects

Displayed title

Dominie Creek

Description

Dominie Creek bridge lies on ancestral territory where Caltrans and Tolowa Dee-ni’ Nation worked together to replace the old dilapidated box culvert structure. The finished bridge has an emblem of spawning salmon at each abutment barrier wall which was inspired by the locations salmon and trout spawning.

Infrastructure

Displayed title

Mosquito Creek BC

Description

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Infrastructure

Displayed title

Caderousse Dam

Description

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

Infrastructure

Displayed title

Grafstal road bridge

Description

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Infrastructure
Give shape to tomorrow.
Loading
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100