HomeProjects
 

Projects

We’ve been providing architects and engineers with the right material to bring their vision to life for over 25 years now. That’s more than two decades and a half of concrete proof of Ductal®’s strength, durability, adaptability and innovation.

We think these realisations speak volumes of our ability to bring form and function together in perfect harmony. Let’s work together to make your next project stretch the definition of what’s possible – even further.

 

Sevenans metallic culvert

This pipe, located under the toll motorway A36 is called PI17 at Sevenans 90. This site was carried out within the framework of works contract managed by APRR.

 

Parking Saas Fee

Deformation of the concrete rolling surface, structural deficit in terms of puncture resistance, sloping terrain (5% gradient) ... the equation to be solved for the repair of the covered car park at the
Saas-Fee ski resort was arduous. Ductal® took up the challenge and developed an...

 

Dominie Creek

Dominie Creek bridge lies on ancestral territory where Caltrans and Tolowa Dee-ni’ Nation worked together to replace the old dilapidated box culvert structure. The finished bridge has an emblem of spawning salmon at each abutment barrier wall which was inspired by the locations salmon and trout...

 

Mosquito Creek BC

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Loading
Pioneering technologies for every need.
Find concrete solutions to tomorrow’s challenges.
Loading
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100