Route 76 SNJ
Information

location_on Location: South New Jersey, USA

date_range Date: 2023

architecture Contractor: South State & NJDOT/NJ TRANSIT

The completion of the Route 76 Over Klemm is a major milestone in infrastructure development in South New Jersey. Despite facing numerous obstacles, this project has successfully reached its conclusion, marking a significant achievement in enhancing transportation infrastructure in the region. 

The journey towards completing Route 76 Over Klemm Avenue was not without its challenges. With four phases of construction, each consisting of four spans, the project required meticulous planning and execution to overcome obstacles along the way. From navigating complex logistics to managing unforeseen delays, our team encountered a myriad of challenges that tested our resolve and ingenuity.

Challenge

route-76-snj_2396.jpg

Despite the challenges, our commitment to excellence drove us to optimize every aspect of the project. To manage traffic effectively, a moving barrier system was deployed, ensuring continuous flow while maintaining cost-efficiency. Stringent safety measures were implemented to protect both infrastructure and wildlife, ensuring that the project adhered to the highest standards of environmental stewardship.

Optimization

route-76-snj_9448.jpg

Ductal Overlay emerged as the optimal solution for this project. Its unparalleled strength, durability, and low permeability ensure longevity and minimized maintenance requirements, making it ideal for enhancing the structural integrity of the overpass. By deploying Ductal Overlay, we not only addressed immediate needs but also safeguarded the longevity and resilience of the infrastructure for generations to come. The successful completion of Route 76 Over Klemm Avenue would not have been possible without the dedication and expertise of our partners, South State and NJDOT/NJ TRANSIT. Their unwavering commitment to excellence and collaboration played a crucial role in overcoming challenges and delivering exceptional results.

Collaboration

route-76-snj_1326.jpg

Gallery

route-76-snj_9456-1.jpg
route-76-snj_2396-1.jpg
route-76-snj_9448-1.jpg
route-76-snj_1326-1.jpg

Discover our projects

The rehabilitation of Mauves-sur-Loire bridge consists in substituting the existing deck (3,500 m²) made of brick vaults with a thin deck made of thin precast UHPFRC slabs. The main objective of the project is to upgrade this historic landmark by increasing its bearing capacity and allowing the addition of cantilevered footbridges.

A structure that symbolizes US bridge engineering of the 1930s, the Pulaski Skyway, which links Newark to Jersey City has been partially closed as it undergoes a considerable rehabilitation - the largest in its history. The project was a perfect opportunity for the Federal Highway Administration (FHWA) and the New Jersey Department of Transportation (NJDOT) to take full advantage of...

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

The Arlington Memorial Bridge is located in Washington DC which carries traffic over the Potomac River. The original structure used masonic decorative features which gives this bridge an iconic look.

Dominie Creek bridge lies on ancestral territory where Caltrans and Tolowa Dee-ni’ Nation worked together to replace the old dilapidated box culvert structure. The finished bridge has an emblem of spawning salmon at each abutment barrier wall which was inspired by the locations salmon and trout spawning.

The concrete of the abutments and central pillars of the Grafstal road bridge (municipality of Lindau) above the A1 motorway showed damage due to chloride infiltration.

Eastbourne Arndale Shopping Centre is a £85 million redevelopment including 22 retail units, seven restaurant units, a multiscreen cinema and a significant extension to the multi-storey car park.

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

The four tracks of Zurich Airport's underground railway station have been renovated and lowered without interrupting traffic.

The Gardiner Expressway structure rehabilitation is part of the City of Toronto’s Strategic Rehabilitation Plan in order to rehabilitate and keep the structure in a safe and operable condition for now and the future.

The completion of the Route 76 Over Klemm is a major milestone in infrastructure development in South New Jersey. Despite facing numerous obstacles, this project has successfully reached its conclusion, marking a significant achievement in enhancing transportation infrastructure in the region.