The completion of the Route 76 Over Klemm is a major milestone in infrastructure development in South New Jersey. Despite facing numerous obstacles, this project has successfully reached its conclusion, marking a significant achievement in enhancing transportation infrastructure in the region.

Displayed title
Challenge

Description

The journey towards completing Route 76 Over Klemm Avenue was not without its challenges. With four phases of construction, each consisting of four spans, the project required meticulous planning and execution to overcome obstacles along the way. From navigating complex logistics to managing unforeseen delays, our team encountered a myriad of challenges that tested our resolve and ingenuity.

Displayed title
Optimization

Description

Despite the challenges, our commitment to excellence drove us to optimize every aspect of the project. To manage traffic effectively, a moving barrier system was deployed, ensuring continuous flow while maintaining cost-efficiency. Stringent safety measures were implemented to protect both infrastructure and wildlife, ensuring that the project adhered to the highest standards of environmental stewardship.

Displayed title
Collaboration

Description

Ductal Overlay emerged as the optimal solution for this project. Its unparalleled strength, durability, and low permeability ensure longevity and minimized maintenance requirements, making it ideal for enhancing the structural integrity of the overpass. By deploying Ductal Overlay, we not only addressed immediate needs but also safeguarded the longevity and resilience of the infrastructure for generations to come. The successful completion of Route 76 Over Klemm Avenue would not have been possible without the dedication and expertise of our partners, South State and NJDOT/NJ TRANSIT. Their unwavering commitment to excellence and collaboration played a crucial role in overcoming challenges and delivering exceptional results.

Discover our projects

Displayed title
Pulaski Skyway

Description

A structure that symbolizes US bridge engineering of the 1930s, the Pulaski Skyway, which links Newark to Jersey City has been partially closed as it undergoes a considerable rehabilitation - the largest in its history. The project was a perfect opportunity for the Federal Highway Administration (FHWA) and the New Jersey Department of Transportation (NJDOT) to take full advantage of the technical benefits offered by Ductal® Infrastructure joint fill over the 5.5km long bridge from Newark Airport to the Holland Tunnel.

Infrastructure

Displayed title
Nipigon Cable

Description

Mosquito Creek Bridge was in need of a rehabilitation due to its age and deterioration to bring it up to modern seismic standards. This bridge was the first bridge constructed in Canada to use pre-stressing, completed in 1952 andis located in North Vancouver, near Marine Drive and Fell Ave.

Infrastructure

Displayed title
Gardiner Expressway

Description

Put into service in 1975, the Caderousse dam is a storage reservoir on the Rhône River in Vaucluse, France.

Infrastructure

Displayed title
Gardner Bridge

Description

The Gardner River Bridge, with its impressive dimensions and historical significance, posed unique challenges for rehabilitation. To address these challenges, our Ductal Holcim US Engineered Solutions Team developed cutting-edge UHPC Technologies, leveraging materials made in the USA. This commitment to innovation and excellence allowed us to optimize our approach, ensuring durability and sustainability in bridge preservation and repair.

Infrastructure
Give shape to tomorrow.
Loading
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100