Yunnan Bridge
Information

location_on Location: Honghe Hani, China

date_range Date: 2020

height Size: 700 m

architecture Contractor: Sinohydro Bureau 8

The Honghe Suspension Bridge between Honghe Hani and Yi Autonomous Prefecture in Yunnan Province, South of China was completed within 35 days. 

This suspension cable bridge is an important project to strengthen the transportation infrastructure and the economic development in the south of Yunnan province and it will be one of the biggest cable suspended bridges with a steel deck done in UHPC in the world: 700m long and 30m width.

Description

yunnan_bridge_ductal_1.jpg

Ductal® Overlay solution was selected due to its capacity to enhance durability and safety, reduce maintenance costs along the bridge life cycle and its quick implementation to respect the tight schedule.

Optimization

yunnan_bridge_ductal_5.jpg

Gallery

yunnan_bridge_ductal_4-1.jpg
yunnan_bridge_ductal_5.jpg
yunnan_bridge_ductal_1.jpg
yunnan_bridge_ductal_3.jpg

Discover our projects

The Honghe Suspension Bridge between Honghe Hani and Yi Autonomous Prefecture in Yunnan Province, South of China was completed within 35 days.

The Chillon Viaducts have been reinforced by an Overlay of Ductal® UHPC. Thanks to its mechanical characteristics and its durability properties, Ductal® was the only material able to provide an efficient retrofitting preserving the bearing capacity of the bridge, a lower maintenance cost and a quick retro commissioning of an important axis of the Swiss highway network. The two Chillon...

In 1951, the Delaware Memorial Bridge was opened to traffic allowing commuters to navigate over the Delaware River on a 3,650 ft (1,112 m) long state-of-the-art suspension bridge. The structure is a twin suspension bridge crossing the Delaware River. This roadway is a major artery which carries I-295 from New Jersey to Delaware. This is a toll road where any...

The Commodore Barry Bridge spans over the Delaware River from Chester PA to Bridgeport NJ. Originally constructed in 1969 and named after the Revolutionary War Hero from Philadelphia John Barry. This bridge is a cantilever truss bridge which was commonly built during those times.

A new life for an emblematic structure: The Kanderviadukt was stabilised using a protective coat of Ductal®.

In partnership with Iowa State University and Iowa State DOT, with participation from Wapello and Buchana counties in Iowa, this project was the first to implement overlay application of UHPC using automated paver system brought by Walo from Europe.

State Route 141 over I95 interchange rehabilitation was commenced in 2019 and expected to be fully completed by Spring 2022. Several crossing structures within this interchange utilized precast panels and required UHPC for all the connections.

Deformation of the concrete rolling surface, structural deficit in terms of puncture resistance, sloping terrain (5% gradient) ... the equation to be solved for the repair of the covered car park at the Saas-Fee ski resort was arduous. Ductal® took up the challenge and developed an innovative product meeting all these constraints.

The Gardner River Bridge, with its impressive dimensions and historical significance, posed unique challenges for rehabilitation. To address these challenges, our Ductal Holcim US Engineered Solutions Team developed cutting-edge UHPC Technologies, leveraging materials made in the USA. This commitment to innovation and excellence allowed us to optimize our approach, ensuring durability and sustainability in bridge preservation and repair.